10.12.2019
Company News → 2019 → 12.2019 → 10.12.2019 |
News of construction of a residential building on the street Dagaeva, 3 // 10.12.2019 The facade of block-section 1-2 is painted. In the 2nd section, work is being carried out on the installation of the elevator cabin, the laying of heating pipes in the apartments, and the installation of heating radiators. |
Показано 1 - 1 (всего 1) | Страницы: 1 |